Drawing of a tunnel thruster: a tube through the bow below the waterline, the hull cut away to show the motor on top.
Our drawing of a tunnel thruster, the same for every maker. It is not Sleipner’s own design.

Sleipner · tunnel thruster · bow or stern

Sleipner E350 HD eVision: specs, price and the boats it fits

It gives 772 lb (350 kgf) of push. Sleipner sells it for boats of 62 to 98 ft. It runs on 48 V.

The unit$17,750Equipment only, Imtra, read 26 October 2026
Installed by a yard, 70 ft boat$27,568 to $38,562Our estimate: the unit, labor, haul-out, battery and parts
  • Haul-out to install
  • DIY 2 of 5: wiring prep only
  • 2-year warranty

Quick stats

  • Thrust 772 lb 350 kgf, Sleipner's rating
  • Boat length 62 to 98 ft Sleipner's own range
  • Price per lb of thrust $22.99 Unit only. $36 to $50 installed
  • Voltage 48 V As sold
  • Battery at 48 V 1,035 CCA Four batteries, near the thruster
  • Run limit Not published Ask the maker before long use
  • To install it Haul-out The boat comes out of the water
  • Mounts Tunnel Fixed mount, bow or stern

About the Sleipner E350 HD eVision

The E350 HD is a 300 mm eVision tunnel with 772 lb of push at 48 V, for boats of about 62 to 98 ft. HD is Sleipner’s heavy-duty build, and the manual covers it alongside the HDB.

Imtra lists the HD at $17,750, before a separate tariff line. The manual gives 545 A, an ANL 500 fuse and a minimum bank of 545 cold cranking amps DIN. Its weight is still marked to be confirmed in that manual. See the specs.

Read more

The motor is brushless and rated continuous at full thrust at 22 C, so how long it runs comes down to the battery bank. Warranty: two years for leisure boats.

Installing it yourself? The installer section has every spec, and the Sleipner (Side-Power) review sets this model against the rest of the Sleipner range.

Sleipner sold its thrusters under the Side-Power name until 2021, and many dealers and owners still call them that. It is the same company and the same thrusters.

Where this summary comes from (5 sources, read 15 October 2026)

Will the Sleipner E350 HD eVision steer your boat?

80 FT TRAWLER · BOW · 15 KT WIND

Size forThis page always opens on Steering.

Every knot figure here is wind speed, not boat speed or current.

Steers her at 20 kt

On a 80 ft trawler the Sleipner E350 HD eVision (772 lb) steers her in a 20 knot breeze. Her bow needs about 428 lb from a tunnel to steer her in a 15 knot breeze.

The finder lists it for her.

28 FT LEVER E350 HD eVision pivot

A tunnel at the bow of a 80 ft trawler 428 lb ★ this unit · 1 to 3: the three cheapest others that steer her at 13 kt or more, installed

  1. ★ Sleipner E350 HD eVision this unit 772 lb · tunnel from $27,728 Steers her at 20 kt
  2. 1 Max Power CT225 (composite leg) 551 lb · tunnel from $13,257 Steers her at 17 kt
  3. 2 Lewmar 300TT 10.8kW 24V 550 lb · tunnel from $16,356 Steers her at 17 kt
  4. 3 Max Power CT325 (24 V) 717 lb · tunnel from $16,407 Steers her at 19 kt

The Sleipner E350 HD eVision on a trawler, by length

  1. 25 ft64 kt
  2. 30 ft54 kt
  3. 35 ft46 kt
  4. 40 ft41 kt
  5. 45 ft36 kt
  6. 50 ft32 kt
  7. 55 ft29 kt
  8. 60 ft27 kt
  9. 65 ft25 kt
  10. 70 ft23 kt
  11. 75 ft22 kt
  12. 80 ft20 kt

Outlined: the finder does not list it at that length (under 13 kt, far more than she needs, or outside Sleipner’s own length range).

  • Under 10 kt
  • 10 to 15 kt
  • 15 to 20 kt: the sweet spot
  • Over 20 kt: more than she needs

Prices are the low end of the installed total, from our estimate. For your own boat, drive and installer, the finder prices each unit.

Is it right for your boat?

What Sleipner says 62 to 98 ft The maker's own range, from its listing
What our sizing says 80 ft Full thrust in 15 knots, across the kinds of boat it fits
Every kind of boat it fits, by length ten boat types
Which boats it fits, by length
Boat Full thrust at 15 knotsStill a fit, in lighter wind
Pontoon & tritoon Not listed. A pontoon has no hull body between the logs to bore a tunnel through, and nobody sells one for these boats.
Sailboat 77 to 80 ft None
Houseboat 57 to 80 ft None
Catamaran No length. More thrust than the boat needs.
Trawler 76 to 80 ft None
Motor yacht 76 to 80 ft None
Bass & flats Not listed. Nobody sells a tunnel kit for these hulls, and a bass boat’s shallow planing bow has almost no depth to hold one.
Wake & ski boats Not listed. Nobody sells a tunnel kit for these hulls.
Express cruiser No length. More thrust than the boat needs.
Center console No length. More thrust than the boat needs.

The Sleipner E350 HD eVision against each kind of boat, in a 15 knot wind. Our sizing, from the finder’s own rules.

The first column is where one unit gives all the thrust the boat needs in 15 knots. The second is where the finder still lists it: the unit steers her in a 13 or 14 knot wind, within 15 percent of the 15 knot breeze this site sizes for. On a boat shorter than the first column’s shortest length, the unit is more than the boat needs.

How we size it

Our figure is the longest boat one unit can steer in a 15 knot wind. It is a range because each kind of boat catches the wind differently. Here every kind of boat it fits gets full thrust to 80 ft. The maker gives one range for every boat.

The table tries the Sleipner E350 HD eVision on each kind of boat, at every length that kind of boat is built in. The wind is 15 knots and the rules are the finder’s own. A length counts as a fit when the unit gives the thrust that boat needs at the bow and the maker lists it for that length.

A boat up to 10 percent past the maker’s range still counts here, as it does in the finder. So the table runs down to 57 ft, just past Sleipner’s own range (62 to 98 ft).

It is sized for four kinds of boat here. For your own boat, the finder gives an answer that also counts your drive and who does the installing. The compare page sets this unit beside others.

What it costs installed

A yard job, everything in. Our estimate.

Installed by a yard
Boat Total installed
57 ft $27,348 to $37,932$35 to $49 a lb of thrust
70 ft $27,568 to $38,562$36 to $50 a lb of thrust
80 ft $27,728 to $39,042$36 to $51 a lb of thrust

From the shortest to the longest boat it is sized for.

What is in each total five lines

These totals are our estimate of a yard job: the unit’s price, plus a yard’s hours at $160 to $180 an hour, plus the batteries, cable and charger, plus the other parts the box does not hold. A Lifting the boat out of the water on a travel lift or a trailer so work can be done below the waterline. It is billed separately from the job itself. adds $1,110 to $3,860 at these lengths, with 5 to 7 days out of the water, worked from eight yards’ own rate cards. The hours come from what owners and yards report. The cost page builds the same figures line by line.

Each line of the estimate
Boat length The unit Yard labor Haul-out Batteries, cable, charger Other parts
57 ft $17,750 $5,120 to $12,60032 to 70 hours $1,110 to $2,750 $2,179 to $2,702 $1,189 to $2,130
70 ft $17,750 $5,120 to $12,60032 to 70 hours $1,330 to $3,380 $2,179 to $2,702 $1,189 to $2,130
80 ft $17,750 $5,120 to $12,60032 to 70 hours $1,490 to $3,860 $2,179 to $2,702 $1,189 to $2,130

For every length in the table above.

How the batteries, cable and charger add up. We price a battery bank close to the thruster, as the makers recommend, with 10 to 20 ft of cable out and back: red for the positive, black for the negative, cut to length. The low end is the cheapest battery that meets the figure and the shorter run; the high end is a sealed (AGM) battery and the longer run. The charger is a NOCO GEN5X2 two-bank shore charger.

Batteries and lugs are priced at Fisheries Supply and the cable and charger at Defender, read 26 October 2026.

  • At 48 V: four 12 V batteries in series, at least 1,035 CCA each (Sleipner’s minimum), $1,772 to $2,208 for all four; Sleipner’s cable table gives 2/0 AWG: $114 to $201 for the red and black cable and the lugs; two GEN5X2 chargers, $293.

The sizing and the costs on this page are estimates, for guidance only and without warranty. They are no quote, and nobody has inspected your boat. Check them against the maker’s manual and your yard before you rely on them. Terms of use.

DIY breakdown

DIY 2 of 5: Wiring prep only. The yard installs the unit and does the hull work; you do the wiring prep.

DIY levels

  • Level 5: Owner install. No yard, no electrician.
  • Level 4: You install it, electrician connects. You mount and wire it; a marine electrician makes the final connections.
  • Level 3: Split with the yard. The yard does the below-waterline part; you do the wiring.
  • Level 2: Wiring prep only. The yard installs the unit and does the hull work; you do the wiring prep.
  • Level 1: Yard job. A qualified professional does all of it.

You Yard Electrician. The bar is labor hours; a haul-out is a note.

How we rate DIY

You: 4 to 16 hours Yard: 32 to 70 hours Electrician: 2 to 4 hours Plus a haul-out.

Your part needs:Heavy battery cableCrimping big lugs

Every step, and who does it three steps
  1. Cut, bond and fair the tunnel; fit the gear leg, motor and propeller Yard 32 to 70 hours The low end is two crew over two days, the job as owners describe it on the forums. The high end rises with boat length between two real billed figures: 32 hours at 35 ft, and the largest invoice we hold, 70 hours at 47 ft.
  2. Mount the battery box, switch and fuse holder; run and secure the cables You 4 to 16 hours Our estimate. No maker times this step, and a first-time owner is slower than a yard, so the range is wide.
  3. Final connections at the battery and the motor, load test Electrician 2 to 4 hours Our estimate. Nobody publishes a time for the final connections and test on their own.

A qualified marine electrician should make the final connections and test them before first use. Hours are labor only.

Related videos

Two from Sleipner’s own channel and one from other channels. Each one is labeled. They play from YouTube only when you tap. Take any claim in a video back to the figures on this page, which are the ones we checked.

Sleipner Bow Thruster Installation by Florida Bow ThrustersDealer install Imtra, Sleipner’s US distributor, March 2025
eVision: Sleipner e-series thrustersMaker Sleipner’s own channel
Sleipner / Side-Power thruster systems - the importance of correct tunnel installation!Maker Sleipner’s own channel

Know before you buy

What sets this model apart, what it costs to keep, and what to weigh.

Price per pound of thrust

$22.99 a lb The unit’s price over its published thrust. The bars are Sleipner’s next sizes and the nearest other makers.

Controls

A brushless eVision motor on S-Link control. The panel, fuse and main switch are bought.

Service and warranty

Sleipner gives 2 years for leisure use and 1 for commercial use. It transfers to the next owner, and it starts no later than 18 months after the boat's first launch.

See Sleipner’s warranty Sleipner's warranty statement, effective 1 April 2022.

Special mentions

Battery: at 48 V it wants four batteries of 1,035 CCA or more, Sleipner's figure. The cheapest that meets it is the Dyno Group 8D heavy duty marine starting (flooded), $443.02. A sealed one is the Lifeline GPL-3100HC Group 31 AGM starting, $551.95. Check your own bank.

Charger: a NOCO GEN5X2 two-bank shore charger, $146.41. It is the one our estimate prices.

Sleipner sells it for either end, so it can go at the bow or the stern.

Dealer prices at Fisheries Supply, read 26 October 2026.

What to weigh

The boat comes out of the water to install it: it needs a tunnel bore below the waterline.

Parts for the Sleipner E350 HD eVision

See the Sleipner E350 HD eVision manual

Search for the number as printed here, with no spaces. Prices are each dealer’s on the day shown, before shipping and tax. Check the plate on your motor before you order: some parts change with the tunnel size, the voltage or the year.

For the install what the box leaves you to buy

15 parts

The manual button above opens it on the maker's product page. It has the hull, wiring and fuse figures for this model.

From Sleipner’s E350 HD eVision installation guide, document 8041 rev 2, read 25 October 2026.

In the box
The guide prints no box list. It has you install the unit with the gasket and the bolts provided.
Bought separately
The ANL fuse and a main switch ("must include"), an S-Link control panel with its own guide, the S-Link cables, the tunnel and the battery cable. Imtra, Sleipner's US distributor, lists the same items to buy with a new thruster.
Charging
The word "charging" is not in any of the Sleipner guides we read. The battery is sized by cold cranking amps, and a battery near the thruster is suggested. How it gets charged is left to you and your installer.

In Sleipner’s words, from its SE80 to SE150 installation guide, document 2687 rev 30, page 19: “For installations on large vessels with bow and stern thrusters or catamarans a dedicated battery for each thruster should be considered.”

The “other parts” line in the estimate above covers these parts as a range, $1,189 to $2,130 at Fisheries Supply’s prices on 30 September 2026 and 26 October 2026, because the exact items depend on your boat. The batteries, cable and charger have a line of their own. The cost page has what every maker says about each part.

Tunnel tube

Fisheries Supply lists it as “Sleipner fiberglass tunnel tube, 300 mm bore, 1000 mm”.

Sold in lengths from about 39 to 59 in. This is the shortest: the yard cuts the tube to the width of your hull at the thruster.

Part number SM13010

Control panel

Fisheries Supply lists it as “Side-Power PJC211 S-Link LCD panel and joystick, one thruster”.

For eVision, a PJC2xx panel needs hardware V3.000 or newer and firmware V3.018 or newer; the PJC3xx does not work with it.

Part number SMPJC211

S-Link backbone cable

Fisheries Supply lists it as “S-Link backbone cable, 0.2 m”.

Sold in lengths from 0.2 to 20 m. This is the shortest: measure the run from the helm to the thruster and buy the length that reaches.

Part number SM61320-0.2M

S-Link spur cables

Fisheries Supply lists it as “S-Link spur cable, 0.4 m”.

Sold in lengths from 0.4 to 5 m. This is the shortest: measure the run from the helm to the thruster and buy the length that reaches. You need 2.

Part number SM61321-0.4M

S-Link T-connector

Fisheries Supply lists it as “S-Link T-connector”.

You need 3.

Part number SM61326

S-Link end terminator

Fisheries Supply lists it as “S-Link end terminator”.

You need 2.

Part number SM61327

S-Link power cable, 8 ft

Fisheries Supply lists it as “S-Link power cable, 8 ft”.

Part number SM61328

Main fuse

Fisheries Supply lists it as “Side-Power ANL fuse 500 A”.

The maker's figure: ANL 500.

Part number SMANL500

Fuse holder

Fisheries Supply lists it as “ANL fuse block, 35 to 750 A, cable up to 4/0, with cover”.

Part number 3903

Battery switch

Fisheries Supply lists it as “HD-Series 600 A battery switch, on/off”.

Rated at or above the 500 A main fuse. If your manual names its own switch, use that one.

Part number 3000

Control-circuit fuse holder

Fisheries Supply lists it as “Waterproof in-line ATO/ATC fuse holder”.

The maker asks for a 2 A fuse on the control supply.

Part number 5065

Batteries

Fisheries Supply lists it as “Dyno Group 8D heavy duty marine starting (flooded)”.

You need 4, each at 1,035 CCA or more, in series for 48 V. The cheapest listing that meets it.

Part number DNO 8DC

Battery cable, red and black

Defender lists it as “Ancor tinned battery cable 2/0 AWG, cut to length, red or black”.

You need 10 ft of each color. For about 20 ft of cable in all, out and back. Measure your run and check it against the cable table in the manual: never go smaller than it asks for.

Part number None on the listing. Order it by name.

Cable lugs

Fisheries Supply lists it as “Tin-plated starter lugs, 2/0 AWG, bag of 10”.

The listing runs $27.96 to $29.36 by stud size. Eight ends on one run, with two spare.

Part number 91066-P10

Charger

Fisheries Supply lists it as “GEN5X2 on-board charger, 10 A, 2 banks”.

You need 2. Or a DC-to-DC charger from the house system: ask the electrician.

Part number GEN5X2

Outside the hull replacement parts in the water

2 parts

Propeller, left hand

The propeller on the drive. Sleipner calls it “Propeller 5bl Q-Prop™ SH/SAC360 LH”.

Sleipner lists it for the E350/300TC-48V-HD.

Part number SM-136044
See it at Sleipner No US price found

Propeller, right hand

The propeller on the drive. Sleipner calls it “Propeller 5bl Q-Prop™ SH/SAC360 RH”.

Sleipner lists it for the E350/300TC-48V-HD.

Part number SM-141859
See it at Sleipner No US price found

Inside the boat replacement parts on board

1 part

Main fuse

The main fuse at the battery, in the rating the maker gives. Sleipner calls it “Recommended fuse A”.

The rating on Sleipner's product page for this model.

Part number ANL500
See it at Sleipner No US price found

The install parts are matched to Sleipner’s own figures and priced at Fisheries Supply, with the battery cable at Defender, cut to length.

Spare part numbers come from Sleipner’s parts pages and manuals. A dealer may sell a part we have not priced. Search for the number.

Other sizes and close alternatives

Compare them side by side

The other makers listed are the nearest match each makes, of the same style and for the same end, within a quarter of its thrust. The compare page lists every model, and the thruster index lists every model with a page here.

For the yard and the installer

Every published figure, with its source.

Full spec sheet thrust, motor, mounting, price, part number, documents
Full spec sheet
Thrust and motor
Thrust 772 lb (350 kgf) As printed: 350 kg
Motor22 kW
Voltage48 V
Run limitNot published
Installation
TypeTunnel, fixed mount
End of the boatBow or stern
Tunnel diameter300 mm
What it does to the hullTunnel bore below the waterline
Haul-out to install itYes
Maker’s boat length62 to 98 ft
Price and ordering
Price $17,750 equipment only, a dealer's price, imtra.com, 26 October 2026
Part number E350/300TC-HD48 V, 48 V DC (nominal 42 V DC)
Documents
Manual Installation manualon the maker's product page
The site’s reviewSleipner (Side-Power) review

Every published figure the site holds for the Sleipner E350 HD eVision, with where each came from.

Draw, cable, fuse and battery at each voltage 48 V

These are the maker’s own figures, at each voltage it is sold at. The cable is the size for the shortest run in the maker’s table. A longer run may need heavier cable, and the wiring calculator works that out for your own boat.

Draw, cable, fuse and battery
Voltage Draw Maker’s cable Fuse Battery Run limit
48 V 545 Anominal draw 2/0 AWG for up to 22 ft of cable counted out and back. Longer runs take heavier cableinstallation guide ANL 500installation guide 545 CCA DIN minimumSleipner installation guide, E350 HD and HDB eVision, document 8041 rev 2 (2025) Not published

The Sleipner E350 HD eVision’s draw, cable, fuse, battery and run limit, as the maker publishes them.

The tunnel: length and depth rules

Tunnel length. Avoid a tunnel longer than four times its diameter. Friction inside a long tube slows the water and cuts thrust. Too short, and the flow reaches the propeller before it has straightened, which the manual says causes cavitation and noise. The propeller must sit entirely inside the tube. Sleipner’s installation manual.

Depth below the waterline. As deep as possible under the waterline, and as far forward as possible. The depth for a given model is in that model’s own measurements. Deeper prevents air being sucked in from the surface and raises the water pressure at the propeller. SE20 to SE40 installation guide, 5611 rev 25 (2025).

Our notes from the manual and listings

In the box: A brushless eVision motor on S-Link control. The panel, fuse and main switch are bought.

Our note

The HD build of the 300 mm eVision tunnel at 48 V.

Where each point above comes from
  • Sleipner sells it for either end, so it can go at the bow or the stern.The maker's listing
  • The boat comes out of the water to install it: it needs a tunnel bore below the waterline.The mounting: a bore through the hull, or a housing recessed into it

Not sure this is the one? The thruster finder asks about your boat and prices every unit that fits.

Where to go next

The specs are the maker’s and the dealers’, on the dates shown. The sizing and the costs are our arithmetic, done without seeing your boat.